Thursday, 28 August 2008

Milestone

The floor is on.
A few consecutive days of fine weather gave me the opportunity to complete the ground floor frame, build the floor joists and place the plywood floor.
The plywood floor is a large bracing diaphram and will be eventually covered with a solid wood flooring. A conventional ceiling will be installed under the joists; either timber sarking or plastered gib board. I was pleased to discover that the original building lines at the floor level are within +/- 5mm and  floor square and  level!