Saturday, 12 July 2008
Lintels and top plates
The wet weather continues to moderate the pace of site work. Lintel and sill blocks are being placed. The first of the timbers are being prepared. They will be the top plate/bond beams for the Timbercrete walls. The Lawson Cyprus 200 x 100 beams are hand dressed with a Makita 1806B planer and sealed with Organoil Olde Style Danish Oil ready for fitting.