Thursday, 15 July 2010

Waste and storm water











In early July a period of settled weather made the ground work possible for the Septic and Storm water drainage to be completed. We decided on a conventional septic tank system over the biolytix type system due to cost and complexity. Plumbing and drain laying was the first contracted work for the project. That didn't stop me from pitching in though. All went to plan, which was pleasing, as the drains where covered in the day before more heavy rain.